Facility Setup

We decided to move the office to Canton, MA. At this facility we performed R&D, printer testing, prototyping, and small batch manufacturing of 3D printers.

All set up (pre-electrical work).
Started off with epoxying the floors. Difficult to do before heat is set up during November in Massachusetts.
It came out well.
Moving in day 1.
Shop area being set up.

It took good hours of planning in CAD to get the layout correct. Packing up at the old facility was the most difficult part, particularly the migration of the inventory (hundreds of active part numbers with individual packaging requirements). If I could do it all over again, I would have painted the walls.